"Rapid" Factory LLC

+4915734773868

panel-frame houses from glued timber

+38 (067) 576 39 17

lumber product order

ooorapid@ukr.net Our dealers
Special offer

What makes our
company unique?

Why choose our
timber home?

Options for cooperation

  • The time of ordering of the house kit from the catalog of standard projects is 4 weeks
  • The time of ordering of the house kit for an individual project is 6-8 weeks
  • The time of production and installation of the house kit (if the area of the house kit is more than 300 m2) is more than 10 weeks

The consist of project documentation

  • Architectural solutions
  • Reinforced concrete structures
  • Water supply and sewerage
  • Heating and ventilation
  • Electric power supply
  • Design project

The composition of the house kit

  • Exterior Wall Panels
  • Interior Wall Panels
  • Partition Panels
  • Unterfloor overlap Panels
  • Attic overlap Panels
  • Roof Panels
  • Separate wooden elements of the house kit
  • Corrugated channels and sub-socket boxes are mounted in wall panels
  • Stairs
  • Wall Panels is the the frame construction with a thickness of 150 or 200 mm filled with insulation and OSB lining on both sides. It include finishing with drywall from the inside and rough plaster, or with a ventilation facade from the outside.

Additional equipment

  • Floor Panels
  • Canopy Constructions
  • Production of furniture for houses with mansard
  • Production of doors, stairs and other joinery
  • Installation of an additional layer of drywall, installation of rollets, etc.
  • Manufacture of garages

Additional services

  • Installation of the house kit by qualified construction team
  • Rough plastering of Exterior Wall Panels by manufacturer
  • Production of interior wood finish
  • Production of wooden ventilated facades with factory installation
  • Painting of wooden elements in the factory

"Rapid" Factory LLC

«Rapid» Factory LLC is modern automatic production of quickly constructed panel-frame buildings on the German technology of residential, public and industrial use.

«Rapid» Factory LLC remodeled in 2014, at the moment, it is one of the largest, most modern and automated enterprises throughout Eastern Europe. The factory's capacity is up to 100 000 sq.m. housing per year.

There are the latest advanced technological solutions and ideas on the basis of production. The main part of the processes is carried out not at the construction site, but in the factory, where not individual parts are made, but structures that are completely ready for installation. The main part of the process is not done on the construction site but in the factory where not individual parts are made, but structures completely ready for installation.

Video

Our partners

наши партнеры
наши партнеры
наши партнеры
наши партнеры
наши партнеры
наши партнеры
наши партнеры
наши партнеры
наши партнеры